The units are used to refine gold alloys using aqua regia; minimum obtainable purity is 999.5/1000.
- The units are modular to reduce eventual costs if production increases;
- A vacuum system is used to transfer the acid solutions
- Pyrex glass is used as it is the only material that doesn’t absorb precious metals. It also facilitates the cleaning operations of the reactors and condensers.
- For safety reasons, all parts in pyrex (reactors and condensers) are positioned inside a ppl hood fitted with a suction manifold that can be connected to a fume scrubber, our model TLF/750. The hood has been designed to recover any acid or water leakage.
- The electric heaters for the reactors are fitted with power regulators to control the dissolution process.
- The units are supplied with two containers for HCL and HNO3 positioned in a PPL tray as requested by European laws. The acids are transferred from the storage containers to 2 graduated pyrex containers inside the hood by a vacuum system. From there, they are transferred to the reactors by gravity.
- Filter unit on wheels with a compressed air diaphragm pump to transfer the solutions;
- Cementation tank
- Every unit is supplied with two storage containers on wheels for the king waters as well as a control panel.
Technical Data:
- power supply: threephase
- power: 2.5 kW
- quantity refinable every 24 hours for tank: 6 kg
- dimensions (mm): 1300x2000x2240
- weight: 290 kg
Refining Systems
22MB File amy take 2-3 minutes to download
depending upon your connection speed
Accessories:
The reagents are:
- Nitric acid HNO3 at 36 Bè
- Hydrochloric HCl at 21 Bè
- Various chemical precipitation products
Concerning the chemicals, below are the approx. quantities of acids and chemical products required to refine 1 kg of alloy, with the aqua regia method.
Per kg material :
- 3.8 lt Hydrochloric acid
- 0.9 lt Nitric acid
- 1 kg Metabisulphite of soda
- 200 gr UREA
Description of the TLF/750 fume scrubber In order to avoid drop dragging, a second 200 mm thick layer of raschig rings has been placed upstream to A neutralization solution container is placed beneath the tower. The solution circulation pump has a Technical data:
|
Note:
FOR PRECIOUS METAL LAB ADDITION TO REFINING SYSTEM,
CLICK ON HERE AND CLICK THE REQUEST INFORMATION BUTTON.
| Prices | ||
|---|---|---|
| GOLD REFINING UNIT IAO/20-1 | € 26.570,00 | |
| Packing | € 1.020,00 | |
| Consumables | € N/A | |
| Accessories | € 9.655,40 | |
| Total Unit with Packing Consumables & Acc. | € 37.245,40 |
Ex-Factory, Italy



